Operation of City of San Diego - Chlorine Contact Chamber addition to Miramar Water Treatment Plant Project (Project)
9 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 1999091067
- Lead Agency
- San Diego, City of (City of San Diego)
- Document Title
- Operation of City of San Diego - Chlorine Contact Chamber addition to Miramar Water Treatment Plant Project (Project)
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 6/16/2020
- Document Description
- The City proposed Project will construct a new chlorine contact chamber (CCC) with a capacity up to 215 million-gallons per day (MGD) to be located just east of the new clearwells and within the existing Miramar Water Treatment Plant. The CCC will serve as a backup disinfection system to the existing ozone disinfection system currently in use. This CCC is designed with an adjacent lift station to allow continued operation and minimal process interruption when an ozone outage occurs. The current point of sodium hydroxide addition will be moved downstream of the CCC for improved disinfection efficiency when the ozone treatment is out of service. The CCC will be approximately 245 feet long x 170 feet wide x 15 feet deep. The Project will increase the capacity of the facilities from 144 MGD to 215 MGD to serve the current and projected population.
- Contact Information
-
Sean Sterchi
State Water Resources Control Board San Diego District
1350 Front Street, Room 2050
San Diego, CA 92101
Phone : (619) 525-4159
Location
- Cities
- San Diego
- Counties
- San Diego
- Other Location Info
- 10710 Scripps Lake Drive, San Diego, San Diego County; on the north side of Scripps Lake Drive, north of the intersection with Red Cedar Drive.
Notice of Determination
- Approving Agency
- State Water Board
- Approving Agency Role
- Responsible Agency
- Approved On
- Final Environmental Document Available at
- State Water Board, Division of Drinking Water District Office noted above. The EIR is available from the lead agency.
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- No
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- No
- (4) A mitigation reporting or monitoring plan was adopted for this project
- Yes
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- Yes
Attachments
- Notice of Determination
- 1999091067_Chlorine Contact Chamber PDF 92 K
Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.