P-GPA-06-001: General Plan Amendment to Create a Roadway Designation "Principal Arterial with Bike Lanes" and Adopt the Non-Motorized Transportation Master Plan
226 Documents in Project
Summary
SCH Number
1999082041
Lead Agency
City of Modesto
Document Title
P-GPA-06-001: General Plan Amendment to Create a Roadway Designation "Principal Arterial with Bike Lanes" and Adopt the Non-Motorized Transportation Master Plan
Document Type
NOD - Notice of Determination
Received
Posted
1/11/2007
Document Description
The project consists of amending the Modesto Urban Area General Plan (GPA) to add the roadway designation of "Principal Arterial with Bike Lanes" and adopting the 2006 Non-Motorized Transportation Master Plan (NMTMP) as a reference document to the Urban Area General Plan. Figures 5.1 and 5.2 will be incorporated into the Urban Area General Plan and revised Figure V-1 (sheets 1-4) of the Modesto Urban Area General Plan are attached. This project will amend the Urban Area General Plan to provide a roadway designation that allows bike lanes on Principal Arterial Streets where bicycle facilities will be developed.
Contact Information
Name
Doug Critchfield
Agency Name
City of Modesto, Community & Economic Development Dept.
Contact Types
Lead/Public Agency
Phone
Location
Cities
Modesto
Counties
Stanislaus
Parcel #
Various
State Highways
SR 99, SR 218, SR 108, SR 132
Railways
Union Pacific, Burlington Northe
Airports
Modesto City/County Airport
Waterways
Tuolumne River, Dry Creek
Base
Diablo
Notice of Determination
Approving Agency
City of Modesto
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
N/A
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
N/A
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.