Draft EIR Naval Training Center (NTC) San Diego Redevelopment Project in the City of San Diego;
5 Documents in Project
Summary
SCH Number
1999081140
Lead Agency
City of San Diego
Document Title
Draft EIR Naval Training Center (NTC) San Diego Redevelopment Project in the City of San Diego;
Document Type
NOD - Notice of Determination
Received
Posted
10/5/2004
Present Land Use
.
Document Description
Conditional Use Permit (CUP) to renovate the existing 250,000 SF Building #94 (formerly educational use) at Liberty Station (formerly the Naval Training Center (NTC)) for use as a private school and church including a 3,500-seat sanctuary. The proposed church and school would occupy the profile of the existing building with structural modification. The existing precast concrete building skin would be removed and replaced with plaster on metal framing. The school would occupy the rebuilt southern half which would be a steel structure with concrete on metal deck floors supported by the existing deep foundation system.
Contact Information
Name
Allison Raaf
Agency Name
City of San Diego Planning and Development Review Department
Contact Types
Lead/Public Agency
Phone
Location
Cities
San Diego
Counties
San Diego
State Highways
209
Railways
Amtrak, Freight
Airports
Lindberg Field
Waterways
San Diego Bay
Other Location Info
Adjacent to San Diego Bay approximately 2 miles west of downtown San Diego.
Notice of Determination
Approving Agency
City of San Diego Planning Commission
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.