Draft EIR Naval Training Center (NTC) San Diego Redevelopment Project in the City of San Diego;
5 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 1999081140
- Lead Agency
- City of San Diego
- Document Title
- Draft EIR Naval Training Center (NTC) San Diego Redevelopment Project in the City of San Diego;
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 10/5/2004
- Present Land Use
- .
- Document Description
- Conditional Use Permit (CUP) to renovate the existing 250,000 SF Building #94 (formerly educational use) at Liberty Station (formerly the Naval Training Center (NTC)) for use as a private school and church including a 3,500-seat sanctuary. The proposed church and school would occupy the profile of the existing building with structural modification. The existing precast concrete building skin would be removed and replaced with plaster on metal framing. The school would occupy the rebuilt southern half which would be a steel structure with concrete on metal deck floors supported by the existing deep foundation system.
- Contact Information
-
Allison Raaf
City of San Diego Planning and Development Review Department
Lead/Public Agency
1222 First Avenue, MS 501
San Diego, CA 92101
Phone : (619) 557-7900
Location
- Cities
- San Diego
- Counties
- San Diego
- State Highways
- 209
- Railways
- Amtrak, Freight
- Airports
- Lindberg Field
- Waterways
- San Diego Bay
- Other Location Info
- Adjacent to San Diego Bay approximately 2 miles west of downtown San Diego.
Notice of Determination
- Approving Agency
- City of San Diego Planning Commission
- Approving Agency Role
- Lead Agency
- Approved On
- Final Environmental Document Available at
- City of San Diego Development Services Department Land Development Review Division
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- No
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- N/A
- (6) Findings were made pursuant to the provisions of CEQA
- N/A
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.