Tech-Bilt Lot Split; TPM 20294, Log No. 97-08-12

4 Documents in Project

Summary

SCH Number
1999081129
Lead Agency
San Diego County
Document Title
Tech-Bilt Lot Split; TPM 20294, Log No. 97-08-12
Document Type
NOD - Notice of Determination
Received
Posted
1/16/2002
Present Land Use
Land Use: (17) Estate Residential, 1du/2 or 4-acres; Zoning RR.35 (Rural Residential), 0.35 du/1-acre.
Document Description
The project is the legal subdivision of an 18.9-acre parcel into 4 lots. The lots are proposed to be 5.36, 4.28, 4.34 and 4.97 gross acres in size. Access to each lot is by private driveway via Siete Leguas. The Olivehain Municipal Water District and the Rancho Santa Fe Community Service District will provide water and sewer service. Fire service will be provided by the Rancho Santa Fe Fire Protection District and School facilities available in the San Dieguito Union High and the Rancho Santa Fe Elementary School Districts. The project estimates grading quantities totaling 11,700 cubic yards of cut and 5,800 cubic yards of fill; 5,900 cubic yards will be required to be exported from the site. The maximum slope ratio is expected to be 2:1 with maximum height of 16 feet of cut and 13 feet of fill. The project also includes the re-dedication of a 9.1-acre open space easement and equestrian trail over the western portion of the project. No offsite improvements are anticipated with this project.

Contact Information

Name
Brett S. Solomon
Agency Name
San Diego County, DPLU
Contact Types
Lead/Public Agency

Location

Cities
Rancho Santa Fe
Counties
San Diego
Cross Streets
Siete Leguas/Via Cuatro
Total Acres
18.9
Parcel #
267-030-2000
State Highways
S8-Del Dios
Waterways
San Dieguito River
Township
13S
Range
3W
Base
SBM

Notice of Determination

Approving Agency
County of San Diego Director of Planning and Land Use
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print