Lagunitas Office Park Project

5 Documents in Project

Summary

SCH Number
1999081019
Lead Agency
City of Carpinteria
Document Title
Lagunitas Office Park Project
Document Type
NOD - Notice of Determination
Received
Posted
5/31/2011
Present Land Use
Research/Industrial Park
Document Description
The project consists of 37 single family homes, 36 condominiums on 14 acres, the construction of 84,550 square feet of commercial/office with a 162,400 sq. ft. of parking space on 8.5 acres. Included are 2.5 acres of restoration/open space along the creek from property line to property line, with a 50 foot wide buffer zone. A temporary vehicle bridge will be built for the construction, and the final plan includes a permanent vehicle bridge and two pedestrian bridges. Also included is a sewer line that crosses the creek, three new 24 inch underground storm drain pipes, two storm water detention basins in upland areas, replacement of a 36 inch storm drain pipe with a 48 inch pipe, and three rip-rap outlet structures with headwall, and two will have ungrouted rock energy dissipating structures within the banks. An area near the Highway 101 will be set aside for while tail kite habitat.

Contact Information

Name
Natasha Lohmus
Agency Name
Department of Fish and Game, South Coastal Region
Contact Types
Lead/Public Agency

Location

Cities
Carpinteria
Counties
Santa Barbara
Cross Streets
Via Real/Bailard Avenue
Total Acres
25.3
State Highways
101
Waterways
Pacific Ocean

Notice of Determination

Approving Agency
Department of Fish and Game
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
N/A
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
N/A
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print