Sacramento Capital Public Radio Broadcasting Building

5 Documents in Project

Summary

SCH Number
1999072092
Lead Agency
California State University, Sacramento (CSUS)
Document Title
Sacramento Capital Public Radio Broadcasting Building
Document Type
NOD - Notice of Determination
Received
Posted
4/24/2001
Present Land Use
Zoning: Residential (R-3) and Commercial (C-2) General Plan: Schools Present Land Use: University Campus/Parking/Vacant
Document Description
The proposed project is the construction of a 295-foot lattice tower. Capital Public radio will use the tower of broadcasting. The tower will be surrounded by the future Capital Public Radio Building. The proposed 295-foot tower will replace the 140-foot tower previously shown on the Campus Master Plan at this location. The facility is to be located west of the intersection of State University Drive East and College Town Drive, south of State University Drive South, North of Folsom Boulevard, and east of the Union Pacific Railroad tracks, Sacramento, CA. NW 1/4 Section 15, T8N, R5E, MDBM.

Contact Information

Name
Ronald Richardson
Agency Name
Trustees of California State University/Office of the Chancellor
Contact Types
Lead/Public Agency

Location

Cities
Sacramento
Counties
Sacramento
Cross Streets
College Town Drive and State University Drive East
Total Acres
2
State Highways
U.S. 50
Railways
Union Pacific
Schools
CSUS
Waterways
American River
Township
8N
Range
5E
Section
15
Base
MDBM

Notice of Determination

Approving Agency
The board of Trustees of the California State University
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print