KD Investments Lot Line Adjustment and Parcel Map Subdivision
4 Documents in Project
Summary
SCH Number
1999072060
Lead Agency
Humboldt County
Document Title
KD Investments Lot Line Adjustment and Parcel Map Subdivision
Document Type
NOD - Notice of Determination
Received
Posted
10/5/1999
Present Land Use
The property is currently undeveloped. It has historically been used for timber production and livestock grazing.
General Plan Designation: Residential, Suburban (RS) Jacoby Creek Community Plan. Minimum parcel size:5 to 1 acres. Dwelling unit density range: 0.2 to 1 dwelling unit per acre.
Zoning: Residential, Single Family, with a Special Building Site combining zone specifying a 20,000 sq. ft. minimmi parcel size (R-1-B-3).
Document Description
A lot line adjustment and minor subdivision in the Bayside area. A lot line adjustment between one parcel and a designated remainder. After the lot line adjustment the pacel will approx. the same size as it is currently configured, 5.85 acres. The Remainder will be 32.8 acres in size. The lot line adjustment is proposed to improve the building site on a 5 acre parcel created by a previous parcel map. A tentative map subdivision of the resulting Remainder into four parcels ranging in previous parcel map. A tentative map subdivision of the resulting Remainder into four parcels ranging.
Contact Information
Name
Michelle Nielsen, Planner
Agency Name
Humboldt County Planning Department
Contact Types
Lead/Public Agency
Address
Phone
Location
Cities
Bayside
Counties
Humboldt
Cross Streets
Old Arcata Road & Jacoby Creek Rd.
Zip
95519
Total Acres
38.65
Parcel #
501-011-20
State Highways
101
Railways
North Coast R.R
Schools
Jacoby Creek School
Waterways
Humboldt Bay
Township
5N
Range
1E
Section
17
Base
H.B&M
Notice of Determination
Approving Agency
N/A
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.