Stored Water Recovery Unit (Sixth Addendum)

9 Documents in Project

Summary

SCH Number
1999031100
Lead Agency
Semitropic Water Storage District
Document Title
Stored Water Recovery Unit (Sixth Addendum)
Document Type
NOD - Notice of Determination
Received
Posted
3/16/2016
Present Land Use
Most of the developed lands are developed to irrigated agriculture and pasture.
Document Description
Previously, the Semitropic Groundwater Banking Project was evaluated in an EIR in 1994, and the Stored Water Recovery Project component of the Semitropic Groundwater Banking Project was evaluated in a SEIR in 2000. Clarifications and revisions to the SWRU have been evaluated in five separate, subsequent CEQA addendums. The subject project, evaluated in a Sixth addendum to the SEIR, would revise the SWRU to add an alternative configuration to the well field evaluated in the SEIR. Such well field alternative would increase spatial distribution of the well field wells without increasing the total number of wells, and reduce overall pumping density. Existing EIR and SEIR groundwater impact mitigation measures would apply to the well field alternative.

Contact Information

Name
Jason Gianquinto
Agency Name
Semitropic Water Storage District
Contact Types
Lead/Public Agency

Location

Cities
Wasco
Counties
Kern
Zip
93280
State Highways
46
Waterways
Poso Creek; Kern River Flood Channel
Township
25-27S
Range
22,23E
Section
varies
Base
MD

Notice of Determination

Approving Agency
Semitropic Water Storage District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print