North Embarcadero Visionary Plan

8 Documents in Project

Summary

SCH Number
1999031037
Lead Agency
San Diego, Port of
Document Title
North Embarcadero Visionary Plan
Document Type
NOD - Notice of Determination
Received
Posted
1/14/2008
Present Land Use
Port Master Plan - Centre City Embarcadero/CCDC Centre City Community Plan - Marina Centre City
Document Description
The proposed project includes: (1) prolongation of "C" Street, which may be flanked by retail shops/restaurants, and landscaping. (2) An approximately 205-foot tall hotel north of the prolongation of "C" Street, which would include a hotel lobby, approximately 275 guest rooms and suites, approximately 30,000 square feet of retail and restaurants, ballrooms, meeting rooms, a health club, and a terrace deck that will provide access to the public with escalators and elevators. (3) An approximately 275-foot tall hotel south of the prolongation of "C" Street, between Pacific Highway and Harbor Drive, which would include approximately 525 guest rooms and suites, approximately 50,000 square feet of retail and restaurants, ballrooms, meeting rooms, pools, and a third floor terrace deck that will provide access to the public with escalators and elevators. (4) An approximately 1,330 space public and private parking garage in a two-level subterranean parking facility beneath the two hotel towers. (5) Demolition of the existing surface parking lot and removal of all surface features.

Contact Information

Name
Matt Valerio
Agency Name
San Diego Unified Port District
Contact Types
Lead/Public Agency

Location

Cities
San Diego
Counties
San Diego
Cross Streets
Pacific Highway/Harbor Drive/Laurel Street
Zip
92112-0488
Total Acres
206
State Highways
5
Railways
AT&SF
Airports
Lindbergh Field
Waterways
San Diego Bay

Notice of Determination

Approving Agency
San Diego Unified Port District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.