VLC Greens Neighborhood 1.10

27 Documents in Project

Summary

SCH Number
1999011023
Lead Agency
City of Carlsbad
Document Title
VLC Greens Neighborhood 1.10
Document Type
NOD - Notice of Determination
Received
Posted
11/22/2004
Document Description
The project includes three tentative tract maps to subdivide and grade a total of 156.1 acres into 263 residential lots, 20 private street lots, 1 private driveway lot and 24 open space lots. The project area includes Neighborhoods 2.1 through 2.5 of the Ridges of the Villages of La Costa Master Plan. The master plan established minimum lot size for these neighborhoods is 6,000, 7,500, or 10,000 SF depending on the specific neighborhood. Three Planned Development Permits are requested to allow for gated entries in Neighborhoods 2.1, 2.4 and east of 2.5, private streets in Neighborhoods 2.1 through 2.5 and a minimum lot size of 6,000 SF in Neighborhood 2.5. The Master Plan Amendment is to transfer a total of two dwelling units (one unit each from Neighborhoods 2.4 and 2.6) to Neighborhood 2.3.

Contact Information

Name
Chris DeCerbo
Agency Name
City of Carlsbad Planning Department
Contact Types
Lead/Public Agency

Location

Cities
Carlsbad
Counties
San Diego
Cross Streets
Palomar Airport Road/El Camino Real/LaCosta Avenue
Parcel #
213-030-11, 215-021-07,215-030-06 plus numerous others
Railways
NCTD
Airports
McClellan/Palomar
Schools
Carlsbad Unified and Encinitas Unified
Waterways
Batiquitos Lagoon
Township
12S
Range
4W/3W
Section
23,24
Base
SBBM
Other Information
section: 25-32

Notice of Determination

Approving Agency
City of Carlsbad
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print