Vesting Tentative Subdivision Map 2003-02 (VTSM 03-02[The Vineyard Phase III])

16 Documents in Project

Summary

SCH Number
1998102084
Lead Agency
City of Oakdale
Document Title
Vesting Tentative Subdivision Map 2003-02 (VTSM 03-02[The Vineyard Phase III])
Document Type
NOD - Notice of Determination
Received
Posted
4/10/2006
Document Description
A request by Frontier and Land Companies to subdivide Lot 147 (5.616 acres) and Lot 149 (5.059 acres), zoned Bridle Ridge Specific Plan - 02, Medium-Density Residential District of the Vineyards III Subdivision. The project layout includes a total of 115 lots (10.8 homes/acre) that range in size from 2,192 to 4,296 square feet. The project also includes Lots "A" and "DO" for landscaped open space, paseos and pocket parks. All dwelling units will be detached single-family units with two-car garages. Typical yard setbacks range from a minimum of three feet for garages accessing an alley or private street, four-foot side yards, 10-foot front porch setback to street and five-foot porch setback to the paseo. The proposed subdivision is consistent with the allowable residential densities (8-14 du/acre) and zoning as identified in the Medium-Density Residential (MDR-PD) land use designation in the Specific Plan. The General Plan Land Use designation is Medium Density Residential (MDR).

Contact Information

Name
Pauline Hardie
Agency Name
City of Oakdale
Contact Types
Lead/Public Agency

Location

Cities
Oakdale
Counties
Stanislaus
Cross Streets
Crane Rd. and E St.
Parcel #
63-13-15&25-26
State Highways
108
Railways
BN Sante Fe
Airports
Oakdale Airport
Waterways
STANISLAUS RIVER
Township
T2S
Range
R10E
Section
15/22
Base
MDBM

Notice of Determination

Approving Agency
City of Oakdale
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print