Vesting Tentative Subdivision Map 2003-02 (VTSM 03-02[The Vineyard Phase III])

16 Documents in Project

Summary

SCH Number
1998102084
Lead Agency
City of Oakdale
Document Title
Vesting Tentative Subdivision Map 2003-02 (VTSM 03-02[The Vineyard Phase III])
Document Type
NOD - Notice of Determination
Received
Posted
5/10/2004
Document Description
A request by Mid Valley Engineering (1117 L Street, Modesto, CA 95354), applicant and V.A. Rodden, Inc. (4000 Ellenwood Road, Oakdale, CA 95361), property owner of record to consider a vesting tentative subdivision map for the purposes of dividing 158.92 acres of vacant land into 465 lots for single family residences within a portion of the Bridle Ridge Specific Plan (BRSP) area. Lot sizes range from approximately 5,100+/- to 15,000+/- sf in size and are proposed to be constructed in two development phases designated as Phase 2: 181 lots for single family residential, and a 9.04+/- designated remainder parcel for future Medium Density Residential (3.2+/- acres) and High Density Residential (5.4+/- acres) and an approximate 10-acre school site designated as a remainder parcel; and Phase 3: 284 lots for single family residences and two neighborhood parks.

Contact Information

Name
Steven Hallam
Agency Name
City of Oakdale
Contact Types
Lead/Public Agency

Location

Cities
Oakdale
Counties
Stanislaus
Cross Streets
Crane Rd. and E St.
Parcel #
63-13-15&25-26
State Highways
108
Railways
BN Sante Fe
Airports
Oakdale Airport
Waterways
STANISLAUS RIVER
Township
T2S
Range
R10E
Section
15/22
Base
MDBM

Notice of Determination

Approving Agency
City of Oakdale
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print