San Timoteo Creek Routine Maintenance Activities Project (Streambed Alteration Agreement No. 1600-2015-0179-R6)

5 Documents in Project

Summary

SCH Number
1998094013
Lead Agency
United States Army, Army Corps of Engineers (USACE)
Document Title
San Timoteo Creek Routine Maintenance Activities Project (Streambed Alteration Agreement No. 1600-2015-0179-R6)
Document Type
NOD - Notice of Determination
Received
Posted
4/18/2016
Present Land Use
Flood control, Resource Preservation, Rural Living, Commercial
Document Description
CDFW has executed Lake and Streambed Alteration Agreement No. 1600-2015-0179-R6, pursuant to section 1602 of the Fish and Game Code to the project Applicant, the San Bernardino County Flood Control District. The project is limited to the maintenance and repair of existing facilities within San Timoteo Creek in Federal Reaches 1, 2, and 3a and Basins 1-18. Maintenance activities within Federal Reaches 1, 2, and 3a include: repair of existing concrete structures, access ramps, and roads; vegetation management; and sediment removal. Maintenance activities within Basins 1-18 include: repair of existing concrete structures and riprap; erosion control along earthen banks; repair of existing access ramps and roads; vegetation management within the right-of-way by mowing and non-mechanized vegetation trimming and removal; and sediment removal. Native vegetation on slopes within the facility will be avoided. Maintenance activities will impact a total of 65.26 acres, including 17.55 acres of concrete-lined flood control channel within Federal Reaches 1, 2, and 3a, and 47.71 acres of earthen basins within Basins 1-18.

Contact Information

Name
Claire Ingel
Agency Name
CDFW
Contact Types
Lead/Public Agency

Location

Cities
Loma Linda, Redlands, San Bernardino
Counties
San Bernardino
Cross Streets
Barton, San Timoteo Canyon Road
Total Acres
86to298
State Highways
I-10
Railways
Union Pacific, Burlington Northe
Schools
Loma Linda, Arrowhead Christian
Waterways
San Timoteo Creek

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print