Shasta Valley Asphalt and Aggregate Plant Expansion Project

5 Documents in Project

Summary

SCH Number
1998092078
Lead Agency
City of Yreka
Document Title
Shasta Valley Asphalt and Aggregate Plant Expansion Project
Document Type
NOD - Notice of Determination
Received
Posted
4/23/2010
Document Description
Expansion of operations under Use Permit #2858 issued by the City of Yreka. The project consists of expansion of operation at the existing asphalt batch plant to include: 1) Expansion of site disturbance; 2) Expansion of operations to produce Rubberized Asphalt Concrete (RAC); and (3) Expansion of hours to intermittent nighttime operations typically during the months of April through October, as required for public projects. The project will require modification of the existing use permit (#2858) issued in 1999. The existing use permit excludes the production of rubberized asphalt and nighttime operations of the existing asphalt batch plant. The project also includes relocation of the existing stormwater runoff of the entire project site, including the previous "avoidance area." Additionally, the project proposes a new office (to relocate the office that was proposed on the original 1999 site plan, but has never been constructed), a shop to be located to the northwest of the existing asphalt plant baghouse and landscaping along the northern edge of the project property.

Contact Information

Name
Pam Hayden
Agency Name
City of Yreka
Contact Types
Lead/Public Agency

Location

Cities
Weed, Yreka
Counties
Siskiyou
Cross Streets
N. Foothill Drive, Phillppe Lane, Granite Court
Zip
96097
Total Acres
10
Parcel #
053-681-110
State Highways
I-5, SR-3
Railways
Yreka Western
Airports
No
Waterways
Greenhorn Creek, Yreka Creek
Township
45N
Range
7W
Section
24
Base
MDBM

Notice of Determination

Approving Agency
City Council
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.