SEWER IMPROVEMENT PROJECT-MISSION SPRINGS WATER DISTRICT

4 Documents in Project

Summary

SCH Number
1998091062
Lead Agency
Mission Springs Water District
Document Title
SEWER IMPROVEMENT PROJECT-MISSION SPRINGS WATER DISTRICT
Document Type
NOD - Notice of Determination
Received

Document Description
Note: Review Per Lead The Assessment District (AD) 12 Sewer Improvement Project is a proposal by Mission Springs Water District (District) to install approximately 57 miles of sewer pipelines and wastewater collection to developed portions of the City of Desert Hot Springs in Riverside County, CA. All sewer lines would be installed and contained within existing public rights-of-way (ROW), mostly in paved roads. The Addendum addresses adding approximately 17,700 linear feet (about 3.35 miles) of additional pipeline to the existing 57 miles of pipeline approved in 1999. If approved by the District Board, the whole 60.35 miles of pipeline would be installed over the next several years as funds are made available. The proposed sewer pipelines (made of Vitrified Clay Pipe [VCP]) will range from 4-inch diameter to 12-inch diameter and will be installed from 5-17 feet in depth. Approximately 300 to 500 feet of sewer would be installed each day.

Contact Information
Brent Gray
Mission Springs Water District
66575 Second Street
Desert Hot Springs, CA 92240

760 329 6448

Location

Coordinates
33°56'"N 116°30'"W
Cities
Desert Hot Springs
Counties
Riverside
Total Acres
~60linear mi.
State Highways
I-10
Railways
Union Pacific
Waterways
Mission Creek
Township
2S3S
Range
5e
Section
4-8

Notice of Determination

Approving Agency
Mission Springs Water District
Approving Agency Role
Lead Agency
Approved On
Final EIR Available Location
N/A

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A Statement of Overriding Considerations was adopted for this project
No
(5) Findings were made pursuant to the provisions of CEQA
N/A