Foothill Water Treatment Plant Optimization Project

6 Documents in Project

Summary

SCH Number
1998082084
Lead Agency
Placer County Flood Control And Water Conservation
Document Title
Foothill Water Treatment Plant Optimization Project
Document Type
NOD - Notice of Determination
Received
Posted
7/21/2004
Present Land Use
Rural residential, commercial, undeveloped natural lands.
Document Description
The proposed Foothill Raw Water Project includes acquisition of private property for temporary construction easements and permanent maintenance and facility easements as well as the construction and operation of water pipelines and associated facilities. Specifically, the proposed project includes: (1) a modified 14,700-foot-long 48/36-inch raw water supply pipeline; (2) a new 11,800-foot-long 18-inch treatment water supply pipeline; (3) a new 100,000-gallon hydraulic control standpipe and 500-foot-long, 36-inch overflow pipe; and (4) a new outlet pipeline that could discharge up to 17 cfs of water from the raw water pipeline to Dutch Ravine.

Contact Information

Name
Heather Schoonover
Agency Name
Placer County Water Agency
Contact Types
Lead/Public Agency

Location

Cities
Newcastle
Counties
Placer
Cross Streets
Ophir Road, I-80, Indian Hill Road, Glenview Road, Powerhouse Road
Total Acres
~42
State Highways
I-80, SR 193
Railways
UPRR
Waterways
Dutch Ravine and additional ephemeral and perennial drainages
Other Location Info
Nearest City: New Castle

Notice of Determination

Approving Agency
Placer County Water Agency
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print