Foothill Water Treatment Plant Optimization Project
6 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 1998082084
- Lead Agency
- Placer County Flood Control And Water Conservation
- Document Title
- Foothill Water Treatment Plant Optimization Project
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 7/21/2004
- Present Land Use
- Rural residential, commercial, undeveloped natural lands.
- Document Description
- The proposed Foothill Raw Water Project includes acquisition of private property for temporary construction easements and permanent maintenance and facility easements as well as the construction and operation of water pipelines and associated facilities. Specifically, the proposed project includes: (1) a modified 14,700-foot-long 48/36-inch raw water supply pipeline; (2) a new 11,800-foot-long 18-inch treatment water supply pipeline; (3) a new 100,000-gallon hydraulic control standpipe and 500-foot-long, 36-inch overflow pipe; and (4) a new outlet pipeline that could discharge up to 17 cfs of water from the raw water pipeline to Dutch Ravine.
- Contact Information
-
Heather Schoonover
Placer County Water Agency
Lead/Public Agency
P.O. Box 6570
Auburn, CA 95604
Phone : (530) 823-4886
Location
- Cities
- Newcastle
- Counties
- Placer
- Cross Streets
- Ophir Road, I-80, Indian Hill Road, Glenview Road, Powerhouse Road
- Total Acres
- ~42
- State Highways
- I-80, SR 193
- Railways
- UPRR
- Waterways
- Dutch Ravine and additional ephemeral and perennial drainages
- Other Location Info
- Nearest City: New Castle
Notice of Determination
- Approving Agency
- Placer County Water Agency
- Approving Agency Role
- Lead Agency
- Approved On
- Final Environmental Document Available at
- Placer County Water Agency 144 Ferguson Road Auburn, CA
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- No
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.