Bickford Ranch Phase 1

14 Documents in Project

Summary

SCH Number
1998082073
Lead Agency
Placer County
Document Title
Bickford Ranch Phase 1
Document Type
NOD - Notice of Determination
Received
Posted
3/4/2021
Document Description
The project is comprised of eight sub-projects which are being built as part of the larger Bickford Ranch Specific Plan. The eight sub-projects include the installation of one section of sewer line, the expansion of Sierra College Boulevard into two riparian areas, and the creation of five detention basins. The amendment changes the compensatory mitigation requirements for the project’s impacts to stream and riparian habitats; rather than mitigating entirely onsite, the project will now mitigate partially via onsite habitat creation and partially via the purchase of 4.125 freshwater marsh complex credits from the River Ranch Mitigation Bank.

Contact Information

Name
Gabriele Quillman
Agency Name
California Department of Fish and Wildlife
Contact Types
Responsible Agency

Location

Cities
Lincoln, Rocklin
Counties
Placer
Regions
Northern California
Other Location Info
unnamed tributaries to Dry Creek and Auburn Ravine, in the County of Placer, State of California; within Sections 18-22, Township 12N, Range 7E, U.S. Geological Survey (USGS) map ‘Lincoln’, Sections 28 and 30, Township 12N, Range 7E, USGS map ‘Gold Hill’, and Section 13, Township 12N, Range 6E, USGS map ‘Rocklin’, Mt. Diablo base and meridian; south of State Route (SR) 193 and mostly east of Sierra College Boulevard.

Notice of Determination

Approving Agency
California Department of Fish and Wildlife
Approving Agency Role
Responsible Agency
Approved On
County Clerk
Placer
Final Environmental Document Available at
the office location listed above for the Lead Agency. CDFW’s record of project approval as Responsible Agency is available at CDFW’s regional office.

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Notice of Determination

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print