SFPUC Peninsula Watershed Routine Maintenance Agreement 2018 (Lake or Streambed Alteration Agreement No. 1600-2018-0064-R3)

9 Documents in Project

Summary

SCH Number
1998082030
Lead Agency
San Francisco, City and County of (City and County of San Francisco)
Document Title
SFPUC Peninsula Watershed Routine Maintenance Agreement 2018 (Lake or Streambed Alteration Agreement No. 1600-2018-0064-R3)
Document Type
NOD - Notice of Determination
Received

Document Description
CDFW has executed Lake and Streambed Alteration Agreement No. 1600-2018-0064-R3, pursuant to section 1602 of the Fish and Game Code to the project Applicant, the San Francisco Public Utilities Commission. Project is limited to routine maintenance activities, including: vegetation management (trimming, pruning, mowing, and removal of flow constricting vegetation within the riparian area, and bed, banks and channels of waterways); bank repairs (repair and stabilization of stream banks, pond embankments and other riparian areas is required when a bank is weakened, unstable, or failing); culvert repair and replacement; debris and sediment management; maintenance of rock stream fords; installation of crossing and fords; and other minor maintenance.

Contact Information
Randi Adair
CDFW
2825 Cordelia Road, suite 100
Fairfield, CA 95434

707-576-2786

Location

Coordinates
37°29'43"N 122°22'04"W
Cities
Woodside San Bruno Millbrae Belmont
Counties
San Mateo
Cross Streets
SR 35/ SR 92
Zip
94062
State Highways
35, 92

Notice of Determination

Approving Agency
California Department of Fish and Game
Approving Agency Role
Responsible Agency
Approved On
Final EIR Available Location
2825 Cordelia Road, Suite 100, Fairfield, CA 95434

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A Statement of Overriding Considerations was adopted for this project
No
(5) Findings were made pursuant to the provisions of CEQA
No
Download CSV New Search