San Andreas Reservoir Road Improvement Project (Amended Lake Alteration Agreement No. EPIMS-SMO-40265-R3)

14 Documents in Project

Summary

SCH Number
1998082030
Lead Agency
City and County of San Francisco
Document Title
San Andreas Reservoir Road Improvement Project (Amended Lake Alteration Agreement No. EPIMS-SMO-40265-R3)
Document Type
NOD - Notice of Determination
Received
Posted
9/18/2024
Document Description
The California Department of Fish and Wildlife (CDFW) has amended the executed Lake and Streambed Alteration Agreement (EPIMS-SMO-40265-R3), pursuant to Fish and Game Code section 1602, the project Applicant, San Franciso Public Utilities Commission as represented by Susan Hou. This project will provide road improvements along the perimeter of San Andreas Reservoir in order to maintain access to water utility infrastructure, and protect infrastructure from reservoir debris. Project activities include grading and backfilling to reconstruct slopes of the reservoir's eastern shoreline, riprap installations, installation of a soldier-pile wall, replacement of a debris boom anchor, and replacement of two corrugated metal culverts. The Agreement Measure 2.17 was amended to remove prohibition of the use of geotextile material for slope stability if the Permittee monitors for geotextile exposure or migration to the San Andreas Reservoir.

Contact Information

Name
Serge Glushkoff
Agency Name
CA Department of Fish and Wildlife
Job Title
Senior Environmental Scientist (Specialist)
Contact Types
Responsible Agency

Location

Counties
San Mateo
Regions
San Francisco Bay Area
Other Location Info
The project is located on San Andreas Reservoir in the unincorporated portion of the County of San Mateo, State of California; work will occur at four areas along the San Andreas Reservoir shoreline: Latitude 37.602330, N, Longitude -122.427916; 37.603874, N, Longitude -122.429375; 37.606128, N, Longitude -122.43204; 37.581727, N, Longitude -122.410421; and 37.580250, N, Longitude -122.413563.

Notice of Determination

Approving Agency
CA Department of Fish and Wildlife
Approving Agency Role
Responsible Agency
Approved On
County Clerk
San Mateo
Final Environmental Document Available at
The Final EIR prepared for the project is available to the general public at the office location listed above for the Lead Agency. CDFW’s record of project approval as a Responsible Agency is available at CDFW’s regional office.

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.