Addendum - Project 184 Five-Year Warren Act Contract with U.S. Bureau of Reclamation
12 Documents in Project
Summary
SCH Number
1998082005
Lead Agency
El Dorado Irrigation District
Document Title
Addendum - Project 184 Five-Year Warren Act Contract with U.S. Bureau of Reclamation
Document Type
NOD - Notice of Determination
Received
Posted
8/4/2016
Present Land Use
Project site is currently developed with water supply and conveyance facilities.
Document Description
The activities addressed in the Acquisition, Permanent Repair, and Operation of the El Dorado Hydroelectric Project and Acquisition of 17,000 Acre-feet Per Year of New Consumptive Water Final EIR included acquiring Project 184 and associated features from PG&E Company, conducting various permanent repairs to restore operations of Project 184, continuing to operate Project 184 consistent with Federal Energy Regulatory Commission requirements, and acquiring 17,000 acre-feet of consumptive water supplies to be diverted for the benefit of the El Dorado Irrigation District (District) customers at Folsom Reservoir through a Warren Act Contract with the U.S. Bureau of Reclamation (Reclamation). The Final EIR did not specify the current proposed term of the Contract with Reclamation nor did it contemplate further environmental review and protections addressed in the Remand EIS. No changes are proposed in the operation of Project 184 associated with the Project, and no new facilities are proposed. The Project 184 Long-Term Warren Act Contract and further environmental review will require minor, technical changes to the Final EIR. Therefore an Addendum has been completed by the District in accordance with CEQA Guidelines Section 15164.
Contact Information
Name
Dan Corcoran
Agency Name
El Dorado Irrigation District
Contact Types
Lead/Public Agency
Phone
Location
Cities
Alpine
Counties
Amador, El Dorado
State Highways
Highway 50, 88
Waterways
South Fork American Rv
Notice of Determination
Approving Agency
El Dorado Irrigation District
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.