Addendum Carson Water Regional Recycling Facilities MND Modification and Expansion

2 Documents in Project

Summary

SCH Number
1998071067
Lead Agency
Carson, City of (City of Carson)
Document Title
Addendum Carson Water Regional Recycling Facilities MND Modification and Expansion
Document Type
NOD - Notice of Determination
Received

Document Description
The proposed project is the expansion of the Carson Regional Water Recycling Plant (Carson Plant). The project consists of expanding a water treatment facility which contains microfiltration and reverse osmosis treatment unites to removed suspended solids. This document is prepared as an Addendum to the West Basin Municipal Water District's "Carson Regional Water Facilities Mitigated Negative Declaration, SCH #1998071067" for which the District adopted Mitigated Negative Declaration in August 1998. This Addendum, combined with the original Initial Study and Final MND package (which includes responses to comments), serves as the basis for this second tier environmental review of WBMWD's decision to consider installing the proposed expanded nitrification treatment system to generate the additional product water to meet the proposed demand indentified by the District. As noted above, the proposed project will not exceed the original capacity of the Carson Plant. However, because the type of treatment units are not exactly the same as those identified in the 1998 Initial Study, and analyzed in the original MND documentation, this Addendum has been prepared.

Contact Information
Uzi Daniel
West Basin Municipal Water District
7140 S. Avalon Boulevard, Suite 210
Carson, CA 90746-1296

310-660-6245

Location

Cities
Carson
Counties
Los Angeles
Cross Streets
21029 WILMINGTON AVE/DOMINGUEZ ST.

Notice of Determination

Approving Agency
WBMWD
Approving Agency Role
Lead Agency
Approved On
Final EIR Available Location
WBMWD 17140 S. Avalon Blvd, Suite 210 Carson, CA 90746-1296

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A Statement of Overriding Considerations was adopted for this project
No
(5) Findings were made pursuant to the provisions of CEQA
N/A