State Route 22 West Orange County Connection Project
6 Documents in Project
Summary
SCH Number
1998064001
Lead Agency
California Department of Transportation, District 12
Document Title
State Route 22 West Orange County Connection Project
Document Type
NOD - Notice of Determination
Received
Posted
4/18/2003
Present Land Use
Freeway within State right of way
Document Description
The (Enhanced) Reduced Build Alternative is the identified Preferred Alternative and is divided into three major components:
1. SR-22 Mainline-widening the freeway to construct a High Occupancy Vehicle (HOV) lane in each direction from Valley View Street to approximately SR-55, including The City Drive improvements, a distance of 19.7 kilometers (12.3 miles);
2. I-405/I605 Connector - constructing a new HOV direct connector structure from Katella Avenue south to Saul Beach Boulevard a distance of 3.7 kilometers (2.3 miles).
3. I-405/SR-22 Connector - constructing a new HOV direct connector structure from Seal Beach Boulevard east to Valley View Street, a distance of 3.7 kilometers (2.3 miles).
Contact Information
Name
Leslie Manderscheid
Agency Name
California Department of Transportation
Contact Types
Lead/Public Agency
Phone
Location
Cities
Garden Grove, Los Alamitos, Los Alamitos, Seal Beach, Garden Grove, Westminster, ..., Orange, Santa Ana, Seal Beach, Westminster
Counties
Orange
Cross Streets
SR-22
Total Acres
273
State Highways
I-605, I-5, SR-57, SR-55, SR-39
Railways
Metrolink, Amtrak, Union Pacific
Airports
Armed Forces Reserve Center
Waterways
Santa Ana River, San Gabriel River, Santiago Creek
Other Information
Railways con. BNSF
Notice of Determination
Approving Agency
California Department of Transportation
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.