Upper San Diego River Improvement Project; GPA 99-03;SPA 00-002;R99-004; Log No. 98-10-14

12 Documents in Project

Summary

SCH Number
1998041146
Lead Agency
San Diego County
Document Title
Upper San Diego River Improvement Project; GPA 99-03;SPA 00-002;R99-004; Log No. 98-10-14
Document Type
NOD - Notice of Determination
Received
Posted
10/2/2006
Present Land Use
The proposed project includes a General Plan Amendment and a Zone Reclassification of approximately 552 acres which currently make up the RiverWay Specific Plan Area (SPA) / Upper San Diego River Improvement Project Redevelopment Area.
Document Description
The Channel Road Resource Extraction project is a Specific Plan Amendment, Major Use Permit, and Reclamation Plan for aggregate extraction. The project site is a 22-acre site located north of the San Diego River and west of Channel Road, within the RiverWay Specific Plan (Planning Area XV of the Specific Plan). The project proposes the extraction of available sand resources followed by backfilling with suitable quality fill to establish a nearly level pad that will be suitable for the construction of buildings and/or other uses consistent with the underlying land use designation.

Contact Information

Name
Devon Muto
Agency Name
County of San Diego Department of Planning and Land Use
Contact Types
Lead/Public Agency

Location

Cities
Lakeside
Counties
San Diego
Cross Streets
SR 67 / LAKESIDE AVE / WOODSIDE / RIVERSIDE DR
Total Acres
552
State Highways
SR67
Waterways
San Diego River
Range
SBM
Other Location Info
Lakeside

Notice of Determination

Approving Agency
County of San Diego Board of Supervisors
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.