Approval of An Explanation of Significant Difference For The 1998 Remedial Action Plan, Operable Unit 2, PG&E Martin Service Center, Daly City/Brisbane, Califor

2 Documents in Project

Summary

SCH Number
1998041105
Lead Agency
California Environmental Protection Agency
Document Title
Approval of An Explanation of Significant Difference For The 1998 Remedial Action Plan, Operable Unit 2, PG&E Martin Service Center, Daly City/Brisbane, Califor
Document Type
NOD - Notice of Determination
Received
Posted
10/23/2000
Document Description
The Department of Toxic Substances Control (DTSC) seeks to approve an Explanation of Significant Difference (ESD) pursuant to authorization granted under Section 117 of the Comprehensive Environmental Response, Compensation, and Liability Act and 40 Code of Federal Regulations Section 300.435(c)(2)(I). Preparartion of the ESD is requires because recent site remediation activities revealed the need for removal of additional volumes of contaminated soils from the site beyond volumes estimated in a remedial action plan (RAP) approved vy DTSC in 1998. While these increases change the scope of the project as previously approved, they do not fundamentally alter the remedy selected in the 1998 RAP, thus not requiring a formal RAP amendment. The proposed change includes transporting 5,500 cubic yards of contaminated soil to landfill designed to accept the waste. This soil will be transported, in acccordance with applicable state, federal and local environmental laws and regulations.

Contact Information

Name
Karen Toth
Agency Name
Department of Toxic Substances Control
Contact Types
Lead/Public Agency

Location

Cities
Brisbane, Daly City
Counties
San Mateo
Cross Streets
Geneva/Schwerin
State Highways
101

Notice of Determination

Approving Agency
Department of Toxic Substances Control
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
N/A
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print