Lake Madrone Water Dist. Appl. to SWRCB for Dam & Reservoir

3 Documents in Project

Summary

SCH Number
1998032010
Lead Agency
Lake Madrone Water District
Document Title
Lake Madrone Water Dist. Appl. to SWRCB for Dam & Reservoir
Document Type
NOD - Notice of Determination
Received
Posted
2/24/2000
Document Description
Application30657 seeks an appropriative water rights to divert 200 acre-feet per annum (afa) of water to storage from Berry Creek tributary to the North Fork reservoir with a capacity of 200 acre-feet. The water will be diverted to storage from March 1 to April 15 of each year for the non-consumptive purpose of recreation, fish and wildlife preservation and enhancement, and fire protection. The project consists of a reservoir and an earth and concrete dam 35 feet high and 350 feet long. The reservoir has a surface area of approximately 25 acres and has a maximum depth of 25 feet, when full. No new construction or site clearing activities will be associated with the project. The applicant states that it diverts water to storage only when the reservoir has been lowered for maintenance and nees to be refilled. The season of diversion specified in A30657 is limited to March 1 to April 15.

Contact Information

Name
Paul R. Minasian
Agency Name
State Water Resources Control Board
Contact Types
Lead/Public Agency

Location

Cities
BERRY CREEK
Counties
Butte
Parcel #
NONE
Township
21N
Range
5e
Section
27

Notice of Determination

Approving Agency
State Water Resources Control Board
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.