Loma Alta Creek Detention Basin at El Camino Real
6 Documents in Project
Summary
SCH Number
1998031129
Lead Agency
City of Oceanside
Document Title
Loma Alta Creek Detention Basin at El Camino Real
Document Type
NOD - Notice of Determination
Received
Posted
8/10/2009
Present Land Use
Vacant/ residentail-Industrial/Resident-Industrial
Document Description
The applicant proposes to alter the streambed of Loma Alta Creek to complete the remainder of the Loma Alta Creek El Camino Real Detention Basin. Construction of the Loma Alta Creek Detention Basin was previously authorized by CDFG along with another basin on Garrison Creek at El Camino Real (SAA #5-204-98). The detention basin at Garrison Creek was fully built, but only one-third of the basin at Loma Alta Creek was built prior to the expiration of the previous Agreement. Project activity to completely construction of the basin head and lateral masonry walls and finish the Loma Alta Creek Detention Basin includes the following: a) Trenching a 25-foot wide by 270-foot long construction corridor in order for the wall footings to be built and the walls anchored; b) Pile-driving the sheet pile wall sections into the ground; c) Minor grading and fill; and d) Construction of two concrete outfall structures within the lateral wall to drain the upper detention area into the lower detention area. (SAA #1660-2007-0329-R5).
Contact Information
Name
Tamara Spear
Agency Name
California Department of Fish and Game
Contact Types
Lead/Public Agency
Phone
Location
Cities
Oceanside
Counties
San Diego
Cross Streets
Oceanside Blvd., RDO Dr., El Camino Real, Mesa Dr.
State Highways
SR 76/78
Railways
San Diego Norhte
Schools
El Camino High School
Waterways
LOMA ALTA CREEK
Notice of Determination
Approving Agency
California Department of Fish and Game
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.