Agreement Regarding Proposed Stream Alteration (SAA# 5-075-00)

22 Documents in Project

Summary

SCH Number
1998012091
Lead Agency
California Public Utilities Commission (CPUC)
Document Title
Agreement Regarding Proposed Stream Alteration (SAA# 5-075-00)
Document Type
NOD - Notice of Determination
Received
Posted
5/8/2000
Document Description
CDFG is executing a Lake and Streambed Alteration Agreement pursuant to Section 1603 (SAA #5-075-00) of the Fish and Game Code to the project applicant, The California Public Utilities Commission in conjunction with the applicant's proposal to install and operate the Vernon-Anaheim-Irvine-Placentia Local Loops Fiber Optic Project, a 54.5-mile fiber optic cable segment within portions of Los Angeles and Orange Counties. This project is a small part of a larger nationwide and international fiber optic network. The operator proposes to directionally bore under all seasonal and perennial drainages (16 stream crossing areas) and sensitive habitat areas. Staging areas for entry and exit areas for borings under stream crossings will be located outside the drainage areas and any associated riparian vegetation.

Contact Information

Name
Terri Dickerson
Agency Name
California Department of Fish and Game
Contact Types
Lead/Public Agency

Location

Cities
Orange, South Gate
Counties
Los Angeles, Orange
Other Location Info
Los Angeles River near the I-710 and Wilcox in South Gate, Los Angeles County, and continues to an unnamed tributary to the Santa Ana River at S. Jefferson Street in Orange, Orange County. The project will cross 16 streams in Los Angeles and Orange Counties.

Notice of Determination

Approving Agency
California Department of Fish and Game
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print