Amendment for the Roripaugh Ranch Project (Streambed Alteration Agreement No. 1600-2013-0044-R6 [Revision 1])

30 Documents in Project

Summary

SCH Number
1997121030
Lead Agency
City of Temecula
Document Title
Amendment for the Roripaugh Ranch Project (Streambed Alteration Agreement No. 1600-2013-0044-R6 [Revision 1])
Document Type
NOD - Notice of Determination
Received
Posted
8/6/2018
Present Land Use
Agriculture, Specific Plan-Low Density Residential.
Document Description
CDFW has executed an amendment for Streambed Alteration Agreement No. 1600-2013-0044-R6, pursuant to section 1602 of the Fish and Game Code to the project Applicant, Woodside 05S, LP. The project amendment includes changes to the project design within Long Valley Was and Santa Gertrudis Creek. Within Long Valley Wash, this amendment replaces the ArmorFlex lining with earthen side slopes and authorizes the construction of three grade control structures of ungrouted riprap across the channel width. Within Santa Gertrudis Creek, upstream of Butterfield Stage Road, this amendment authorizes replacing the ArmorFlex banks with ungrouted riprap-lined banks and buried riprap within a portion of the channel bottom. within Santa Gertrudis Creek, downstream of Butterfield Stage Road, this amendment authorizes the widening of this channel by excavating up to 40 feet of the northern channel bank, lining both banks with riprap and buried rock below the toe of slope, and installing maintenance ramps on the north and south side of the channel.

Contact Information

Name
Claire Ingel
Agency Name
CDFW
Contact Types
Lead/Public Agency

Location

Cities
Temecula
Counties
Riverside
Total Acres
819.7
Jobs
433
Parcel #
957-34-01; 957-340-601, 003-8, 958-260-001-3, 957-130-001 & 002
State Highways
79 North
Airports
French Valley
Waterways
Santa Gertruis Creek
Township
7S
Range
2W
Section
20/21

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes