Camarillo Airport
3 Documents in Project
Summary
SCH Number
1997121005
Lead Agency
Ventura County
Document Title
Camarillo Airport
Document Type
NOD - Notice of Determination
Received
Posted
11/8/1999
Present Land Use
Airport General Plan Public No change proposed.
Document Description
The EA/EIR examines the environmental consequences of projects which would enhance safety and security and accommodate future aviation demand at the airport by (1) installation of perimeter security fencing; (2) stormwater drainage improvements; (3) consolidated fuel farm development; (4) construction of a taxiway parallel to the east ramp with marking and lighting; (5) reconstruction of various ramps and roads on-site; (6) constructing 63 T-hangars and relocating 35 port-a-port hangars; (7) construct parallel taxiway to Runway 8-26; (8) constructing 23 executive hangars (privately funded); (9) Other various long-term improvements including improving drainage, safety areas, lighting, marking and striping; construct and relocate additional hangars, parking aprons and helicopter operations on north side of runway, as needed. These improvements are in accordance with the FAA-approved Airport Layout Plan. No significant unmitigatable adverse impacts were identified in the analysis.
Contact Information
Name
Rodney L. Murphy
Agency Name
COUNTY OF VENTURA DEPARTMENT OF AIRPORTS
Contact Types
Lead/Public Agency
Phone
Location
Cities
Camarillo
Counties
Ventura
Cross Streets
Las Posas Road/Pleasent Valley Road
Zip
93010
State Highways
101
Airports
Carmarillo
Notice of Determination
Approving Agency
N/A
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
N/A
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.