Folsom East Interceptor Section 3 Extension Porject

3 Documents in Project

Summary

SCH Number
1997112051
Lead Agency
Sacramento County
Document Title
Folsom East Interceptor Section 3 Extension Porject
Document Type
NOD - Notice of Determination
Received
Posted
7/2/2001
Document Description
The Folsom East Section 3 Extension is a 3.2 mile-lone interceptor extension that would begin at a connection with the Folsom East No. 2 alignment at the Folsom Boulevard/Iron Point Road intersection, continue eastward within the Iron Point Road right of way to a point east of the stormwater detention/retention basins west of Oak Avenue Parkway, where it will join existing sewerage facilities. The pipe will vary in diameter from 36 to 48 inches to adequately serve planned capacity needs in the Folsom East 3 service area. There are two sub-alternatives with the project. Sub-alternative A would follow Iron Point Road and include a pumping station to direct flows uphill. Sub-alternative B would follow Iron Point Road and include gravity flow facilitated by tunneling from east of Prairie City Road to the western boundary of the Broadstone II residential development.

Contact Information

Name
Dennis Yeast
Agency Name
Department of Environmental Reveiw and Assessment
Contact Types
Lead/Public Agency

Location

Cities
Folsom
Counties
Sacramento
Cross Streets
IRON POINT RD/FOLSOM BLVD
State Highways
50
Waterways
LAKE NATOMA
Township
9N
Range
7e
Base
MDBM

Notice of Determination

Approving Agency
County of Sacramento
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.