Heritage Bluffs II
11 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 1997111070
- Lead Agency
- City of San Diego
- Document Title
- Heritage Bluffs II
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 1/24/2017
- Present Land Use
- Undeveloped/Agricultural Residential (AR-1-1) / Low Density Residential
- Document Description
- CDFW is intending to execute a Lake and Streambed Alteration agreement pursuant to Section 1602 of the Fish and Game Code (#1600-2015-0040-R5) to the project applicant, SPIC Del Sur LLC, as represented by Bill Dumka. The project proposes to alter the stream to construct a detention basin and culverted road crossing at Public 'J' Street consisting of a 199.88-foot-long 36" diameter culvert with headwall and riprap energy dissipater and a soft bottomed arch culvert crossing at Public 'G' Street that spans the ephemeral drainage and avoids impacts to waters of the state. The project will result in permanent impacts to 0.02 acre ephemeral drainage.
- Contact Information
-
Kelly Fisher
CDFW
Lead/Public Agency
3883 Ruffin Road
San Diego, CA 92123
Phone : (858) 636-3160
Location
- Coordinates
- 32.9971°'"N 117.1024°'"W
- Cities
- San Diego
- Counties
- San Diego
- Cross Streets
- South of Bernardo Center Drive/Carmel Valley Road and west of I-15
- Zip
- 92127
- Total Acres
- 170
- State Highways
- I-15/SR-56
- Railways
- SDNR/Coaster
- Schools
- Mt Carmel HS, Rancho
- Waterways
- Lusardi creek, unnamed waterways
- Other Location Info
- Black Mountain Ranch
Notice of Determination
- Approving Agency
- Department of Fish and Game
- Approving Agency Role
- Responsible Agency
- Approved On
- Final Environmental Document Available at
- 3883 Ruffin Road, San Diego, CA 92123
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- No
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- No
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.