Supplemental EIR-Effluent Pump Station Annex and Collection System Odor and Corrosion Control Program

13 Documents in Project

Summary

SCH Number
1997101065
Lead Agency
Orange County Sanitation District
Document Title
Supplemental EIR-Effluent Pump Station Annex and Collection System Odor and Corrosion Control Program
Document Type
NOD - Notice of Determination
Received
Posted
12/23/2002
Document Description
The proposed project would involve the construction of a new backup pump station at OCSD's Treatment Plant No. 2 in Huntington Beach. The proposed project also entails the construction of a distribution building, a standby power facility, associated piping, and replacement overflow weirs within the treatment plant boundaries. In addition, OCSD will implement the OCP, which entails applying odor-reducing chemicals via continuous feed systems to trunk sewers. The OCP will install above ground chemical storage tanks to supply the continuous feed systems at various locations throughout the OCSD service area.

Contact Information

Name
James Herberg
Agency Name
Orange County Sanitation District
Contact Types
Lead/Public Agency

Location

Cities
Huntington Beach
Counties
Orange
State Highways
405, 1
Airports
John Wayne
Waterways
Santa Ana River and Pacific Ocean
Other Location Info
And Northern and Central Orange County

Notice of Determination

Approving Agency
Orange County Sanitation District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print