Wastewater Treatment Facilities Improvement Project Outfall & Diffuser Installation

7 Documents in Project

Summary

SCH Number
1997092035
Lead Agency
City of Angels Camp
Document Title
Wastewater Treatment Facilities Improvement Project Outfall & Diffuser Installation
Document Type
NOD - Notice of Determination
Received
Posted
4/13/2009
Document Description
The California Department of Fish and Game is executing Lake or Streambed Alteration Agreement number 1600-2009-0001-R2, pursuant to section 1602 of the Fish and Game Code to the project applicant, City of Angels Camp. City of Angels Camp Wastewater Treatment Facilities Improvement Project Outfall & diffuser Installation - An outfall pipe will extend approximately 50 feet from the WWTF to the creek and will be primarily constructed in upland areas. In order to connect to the diffuser, the outfall pipe will cross approximately 20 feet of non-wetland, riparian habitat. An 8- or 10-inch diameter, 20 foot long diffuser will be placed in the bed of Angel's Creek below the OHWM. The total footprint for the installation will be approximately 3 feet deep, by 5 feet wide by 20 ft across the creek. Rip rap will be placed and revegetation will occur in the riparian disturbance area post-construction. Installation is scheduled to occur during the annual November no flow conditions that result from the Utica Power Authority canal outages and maintenance activities.

Contact Information

Name
Gary L. Hobgood
Agency Name
Department of Fish and Game
Contact Types
Lead/Public Agency

Location

Counties
Calaveras
Cross Streets
Centennial Lane, Tuolumne Avenue and Wilson Street
State Highways
4, 49
Waterways
Angels Creek and Six MIle Creek
Other Location Info
City of Angels

Notice of Determination

Approving Agency
DFG
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print