Shea Homes Parkside Estates Subdivision Parks

7 Documents in Project

Summary

SCH Number
1997091051
Lead Agency
City of Huntington Beach
Document Title
Shea Homes Parkside Estates Subdivision Parks
Document Type
NOD - Notice of Determination
Received
Posted
2/26/2010
Document Description
The Applicant proposes to install a new storm drain connection to convey storm flows from the north side of the East Garden Grove-Wintersburg Channel to the Slater Pump Station Forebay. Installation of a new storm drain is required by the City of Huntington Beach and Orange County as a condition of approval for development of tract 15377 because existing facilities are incapable of carrying a 100-year storm even. A new 120-inch diameter storm drain pipe is proposed for installation under the East Garden Grove-Wintersburg Channel, with a direct connection to the Slater Pump Station Forebay. The proposed storm drain will be installed using an open trench technique that will occur in three phases. The three-phase method of construction will allow for a minimum of one-third (1/3) of the channel invert to remain in use at all times, bypassing flows around the work area. A temporary coffer dam will be made from driven sheet piles to create a relatively dry working area. A trench requiring the removal of 2,400 cubic yards of soil will be excavated across the channel, and the 120-inch diameter storm drain will be placed in the trench. Once in place, the 120-inch storm drain will have a concrete encasement poured around it, and the trench will then be backfilled with soil from the initial excavation. Any remaining soil will be used on the Parkside Estates Development project site.

Contact Information

Name
Russell Barabe
Agency Name
Department of Fish and Game
Contact Types
Lead/Public Agency

Location

Cities
Huntington Beach
Counties
Orange
Cross Streets
Warner Avenue and Graham Street
Total Acres
51
Parcel #
110-015-24,25,26,27
Waterways
Wintersburg Channel
Township
5S
Range
11w
Section
28
Base
SBL

Notice of Determination

Approving Agency
Department of Fish and Game
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.