Inland Compositng and Organic Recycling

7 Documents in Project

Summary

SCH Number
1997071030
Lead Agency
City of Colton
Document Title
Inland Compositng and Organic Recycling
Document Type
NOD - Notice of Determination
Received
Posted
11/27/2001
Document Description
Establishment and operation of a mixed feedstock composting operation by inland composting and organic recycling. The proposed composting operation will occupy 72 acres of vacant land zoned M-1 (Light Industrial) and M-2 (Heavy Industrial). The proposed project will establish a composting facility designed to process up to 1,000 wet tons per day of green waste (including yard trimmings, wood, paper, cardboard, and recycled compost) and organic food production waste, restaurant food wastes, agricultural by-products, and 700 wet tons per day of other organic non-hazardous wastes including manure and biosolids (municipal sewage sludge) from regional wastewater treatment plants and inert materials such as soil, gypsum, and clean concrete from construction and demolition activities. The composting process will involve grinding and mixing of certain feedstocks and bulking materials and placement into windrows. The windrows will be turned a minimum of five times and maintained at or above 55 degrees Celsius during the 15 day "High Temperature" part of the composting process. Finished compost will be tested and stored on site for eventual sale as soil, amendments and other uses.

Contact Information

Name
Lisa Banuelos
Agency Name
City of Colton Community Development Department
Contact Types
Lead/Public Agency

Location

Cities
Colton
Counties
San Bernardino
Cross Streets
RIVERSIDE AVE, AGUA MANSA ROAD
Parcel #
260-91-77 &78
State Highways
I-10, 60
Railways
SP, AT&SF
Waterways
SANTA ANA RIVER

Notice of Determination

Approving Agency
City of Colton
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print