North Shore at Mandalay Bay Response Plan
7 Documents in Project
Summary
SCH Number
1997061004
Lead Agency
City of Oxnard
Document Title
North Shore at Mandalay Bay Response Plan
Document Type
NOD - Notice of Determination
Received
Posted
12/31/2018
Document Description
DTSC approved the Reponse Plan submitted pursuant to LCRRA which 1) outlines the implementation of completed and future response actions expressly authorized by the Feasibility Study/Remedial Action Plan (FS/RAP), as modified by the Partial Remedial Action Completion Report (PRACR); and 2) incorporated the vapor intrusion mitigation systems into the Residential Project.
The selected remedy for the Residential Project will include Vapor Intrusion Mitigation. The process to install VIM includes the development of a design and the installation of the VIM Systems that incorporates both passive and active VIM technologies. The VIM Systems slightly modify the building foundations to create a vented layer beneath the foundation slab which is depressurized with a small fan that preents vapors from the sub-slab from entering the residences within the Residential Project. Ina ddition to the small depressurizing fan, either a highly permeable or low permeable barrier is used to diminish the potential for resident exposure.
NOTE: See NOD for full project description
Contact Information
Name
Sara Vela
Agency Name
Department of Toxic Substances Control
Contact Types
Lead/Public Agency
Phone
Location
Cities
Oxnard
Counties
Ventura
Cross Streets
198 South Harbor Boulevard
Zip
93035
Total Acres
91
Airports
OXNARD
Schools
OXNARD HIGH SCHOOL
Waterways
EDISON CANAL
Notice of Determination
Approving Agency
DTSC
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.