Napa River/Napa Creek Flood Protection Project – Increment 2, Floodwalls North of the Bypass

16 Documents in Project

Summary

SCH Number
1997044002
Lead Agency
Napa County Flood Control and Water Conservation District
Document Title
Napa River/Napa Creek Flood Protection Project – Increment 2, Floodwalls North of the Bypass
Document Type
NOD - Notice of Determination
Received
Posted
3/27/2025
Document Description
Project Description: The Napa County Flood Control and Water Conservation District is proposing to implement measures to provide 100- year level of flood protection in the City of Napa north of the bypass (Increment 2), as part of the USACE Authorized Napa River/Napa Creek Flood Protection Project. The Increment 2, North of the Bypass, flood protection measures consist of four elements: floodwalls south of Lincoln Avenue, floodwalls north of Lincoln Avenue, scour protection under the Lincoln Avenue bridge, and two short floodwall closures at the dry bypass. Construction of these flood protection measures would occur on the west bank of the Napa River and under the Lincoln Avenue Bridge.

Contact Information

Name
Richard Thomasser
Agency Name
Napa County Flood Control and Water Conservation District
Job Title
District Manager
Contact Types
Lead/Public Agency

Location

Cities
Napa
Counties
Napa
Regions
Citywide, Northern California
Cross Streets
Lincoln Avenue
Zip
94559
Jobs
50
State Highways
California
Township
Napa

Notice of Determination

Approving Agency
Napa County Flood District
Approving Agency Role
Lead Agency
Approved On
County Clerk
Napa
Final Environmental Document Available at
https://www.countyofnapa.org/1083/Napa-RiverCreek-Flood-Protection-Project

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.

Download CSV New Search Print