Napa River Flood Protection Project [California Endangered Species Act (CESA) Incidental Take PErmit 2081-2008-014-03 (ITP)]
14 Documents in Project
Summary
SCH Number
1997044002
Lead Agency
Napa County
Document Title
Napa River Flood Protection Project [California Endangered Species Act (CESA) Incidental Take PErmit 2081-2008-014-03 (ITP)]
Document Type
NOD - Notice of Determination
Received
Posted
10/7/2014
Document Description
This proposed project involves the construction of 6,000 linear feet of flood control wall between the Imola Crossing and Third Street Bridge, approximately 3,600 linear feet of floodwall along the Oxbow area north of the Soscol Street Crossing, replacement of the existing railroad crossing and the construction of the Oxbow Bypass.
The Project will result in impacts to 20.57 acres of Longfin smelt and Delta smelt (Spirinchus thaleichthys and Hypomesus transpacificus) (habitat including temporary impacts to 1.44 acres; the Project will permanently remove 19.13 acres of Longfin smelt and Delta smelt habitat. The project is expected to result in incidental take of Longfin smelt and Delta smelt, which are designated as Threatened and Endangered, respectively, under CESA. The ITP referenced above as issued by CDFW authorizes incidental take of species listed under CESA that may occur as a result of Project implementation.
Contact Information
Name
Suzanne Gilmore
Agency Name
CDFW Bay Delta Region 3
Contact Types
Lead/Public Agency
Phone
Location
Cities
Napa
Counties
Napa
Cross Streets
Soscol Avenue/Eight Street/Oil Co. Road
Zip
94559
Total Acres
7
State Highways
121 and 29
Railways
Napa Valley Wine Train
Airports
Napa
Schools
Napa Valley Community College
Waterways
Napa River, New Tulocay Creek, Old Tulocay Creek
Notice of Determination
Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.