Napa River Flood Protection Project [California Endangered Species Act (CESA) Incidental Take PErmit 2081-2008-014-03 (ITP)]

13 Documents in Project

Summary

SCH Number
1997044002
Lead Agency
Napa County
Document Title
Napa River Flood Protection Project [California Endangered Species Act (CESA) Incidental Take PErmit 2081-2008-014-03 (ITP)]
Document Type
NOD - Notice of Determination
Received

Document Description
This proposed project involves the construction of 6,000 linear feet of flood control wall between the Imola Crossing and Third Street Bridge, approximately 3,600 linear feet of floodwall along the Oxbow area north of the Soscol Street Crossing, replacement of the existing railroad crossing and the construction of the Oxbow Bypass. The Project will result in impacts to 20.57 acres of Longfin smelt and Delta smelt (Spirinchus thaleichthys and Hypomesus transpacificus) (habitat including temporary impacts to 1.44 acres; the Project will permanently remove 19.13 acres of Longfin smelt and Delta smelt habitat. The project is expected to result in incidental take of Longfin smelt and Delta smelt, which are designated as Threatened and Endangered, respectively, under CESA. The ITP referenced above as issued by CDFW authorizes incidental take of species listed under CESA that may occur as a result of Project implementation.

Contact Information
Suzanne Gilmore
CDFW Bay Delta Region 3
7329 Silverado Trail
Napa, CA 94558

707-944-5500

Location

Cities
Napa
Counties
Napa
Cross Streets
Soscol Avenue/Eight Street/Oil Co. Road
Zip
94559
Total Acres
7
State Highways
121 and 29
Railways
Napa Valley Wine Train
Airports
Napa
Schools
Napa Valley Community College
Waterways
Napa River, New Tulocay Creek, Old Tulocay Creek

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On
Final EIR Available Location
CDFW Bay Delta Region 3, 7329 Silverado Trail, Napa, CA 94558

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A Statement of Overriding Considerations was adopted for this project
No
(5) Findings were made pursuant to the provisions of CEQA
Yes
Download CSV New Search