Shugart Park Pathway and Footbridge Project (Lake or Streambed Alteration Agreement No. 1600-2014-0069-R3)

6 Documents in Project

Summary

SCH Number
1997031056
Lead Agency
City of Scotts Valley
Document Title
Shugart Park Pathway and Footbridge Project (Lake or Streambed Alteration Agreement No. 1600-2014-0069-R3)
Document Type
NOD - Notice of Determination
Received
Posted
8/15/2014
Document Description
The project is limited to the construction of two new bridges and a paved pedestrian pathway. The pedestrian pathway will range in width from 8 to 12 feet. The westernmost bridge will be approximately 50 feet in length and 12 feet in width. The easternmost bridge will be approximately 60 feet in length and 12 feet in width. Both bridges will be made of single span prefabricated steel and concrete. Bridge abutments will be set back from top of bank. Tributary banks will not be graded as a part of this project. Approximately 0.28 acres of riparian vegetation will be temporarily impacted and 0.06 acres of riparian vegetation will be permanently impacted by the project. Two acacias ranging in diameter at breast height (DBH) from 8 to 10 inches, 5 coast live oaks ranging in DBH from 1 to 2 inches and 5 arroyo willow ranging in DBH from 4 to 6 inches will be removed. No work will occur in the wetted portion of the channel. The California Department of Fish and Wildlife (CDFW) has executed Lake and Streambed Alteration Agreement number 1600-2014-0069-R3, pursuant to Section 1602 of the Fish and Game Code to the project Applicant, Scott Hamby/City of Scotts Valley.

Contact Information

Name
Melissa Farinha
Agency Name
CDFW, Bay Delta Region
Contact Types
Lead/Public Agency

Location

Cities
Scotts Valley
Counties
Santa Cruz
Cross Streets
Glenwood Road/Vine Hill Road

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No