Phase 3 of the Lincoln/Penryn Pipeline and Meterin Station Project ("Project")

27 Documents in Project

Summary

SCH Number
1997022074
Lead Agency
City of Lincoln
Document Title
Phase 3 of the Lincoln/Penryn Pipeline and Meterin Station Project ("Project")
Document Type
NOD - Notice of Determination
Received
Posted
8/4/2016
Present Land Use
Z: Open Space / Passive Park and Public Occupied by City storage pond.
Document Description
PCWA is approving an addendum which addresses project changes to a proposed transmission pipeline (Phase 3 of the Lincoln/Penryn Pipeline and Metering Project),, which was evaluated first as a 24-inch pipeline in the Revised Twelve Bridges Specific Plan SEIR (1998 SEIR) and later as a 30-inch line in the 1999 Addendum. The Project as revised would increase the size of the proposed Phase 3 water supply pipeline from a 30-inch diameter pipe to a 42-inch diameter pipe. As previously analyzed, the pipeline would extend approx. 6,000 feet northward from the existing Phase 1 30-inch pipeline and Phase 2 42-inch Lincoln/Penryn pipeline intersection, near the 5 million gallon Tank #2 storage tank site to a proposed pressure reducing/metering (PR&M) station, the Twelve Bridges PR&M Station as a separate project, evaluated in the Reservoir #6 and Infrastructure SEIR certified by the City of Lincoln. As described in the Reservoir #6 and Infrastructure SEIR, water from the Phase 3 transmission pipeline would exit the Twelve Bridges PR&M Station through 16-inch and 36-inch diameter pipelines. The proposed project change would occur within the same Project footprint that was analyzed in the 1999 Addendum.

Contact Information

Name
Heather Trejo
Agency Name
Placer County Water Agency
Contact Types
Lead/Public Agency

Location

Cities
Lincoln
Counties
Placer
Cross Streets
Via Fuente and Bella Circle
Total Acres
10
State Highways
65
Railways
Union Pacific

Notice of Determination

Approving Agency
Placer County Water Agency
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print