Los Robles Del Mar Specific Plan

4 Documents in Project

Summary

SCH Number
1996103448
Lead Agency
City of Pismo Beach
Document Title
Los Robles Del Mar Specific Plan
Document Type
NOD - Notice of Determination
Received
Posted
3/5/2004
Present Land Use
Designated Low density residential and private school; pre-zoned residential and institutional.
Document Description
The Specific Plan proposes the development of up to 312 dwelling units on Property A and the construction of a private school on Property B. The specific Plan land use concept would create a residential neighborhood with a mix of housing types, including high density affordable senior housing apartments, low density terrace homes, low density estate homes, custom lots and rural estate lots. The project approval process will include annexation of the project site to the City and adoption of a "prezoning" ordinance that would take effect upon completion of the annexation to the City. The project site will incorporate seven (7) zoning districts. These districts include four (4) residential districts [High Density Residential District (RR-1), Low-density Single-Family Residential District (SF-1), Low-density Single-Family Residential District (SF-2), Rural Residential District (SF-3)], two (2) Open Space Recreation District (OS-R) and Open Space Preservation (OS-P)], and one (1) public/semi-public district (P/SP).

Contact Information

Name
Randy Bloom
Agency Name
City of Pismo Beach
Contact Types
Lead/Public Agency

Location

Cities
Pismo Beach
Counties
San Luis Obispo
Cross Streets
Oak Park Boulevard
Total Acres
182
State Highways
101
Railways
Union Pacific
Waterways
Pacific Ocean, Meadow Creek

Notice of Determination

Approving Agency
City of Pismo Beach
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print