Ordinance for Zone Change RZ09-010 to rezone a 4,446 Square Foot (0.1 +/- acre) Parcel from C-1:D:MX (General Commercial:Design Control Combining:Mobilehome Exc

34 Documents in Project

Summary

SCH Number
1996082016
Lead Agency
Tuolumne County
Document Title
Ordinance for Zone Change RZ09-010 to rezone a 4,446 Square Foot (0.1 +/- acre) Parcel from C-1:D:MX (General Commercial:Design Control Combining:Mobilehome Exc
Document Type
NOD - Notice of Determination
Received

Document Description
1. Resolution for General Plan Amendment GPA09-010 to amend the Land Use Element of the General Plan to increase the maximum Floor Area Ratio (FAR) for substandard parcels in the High Density Residential (LDR) land use designations from 0.5 to 0.6 if a parcel is improved with a single-story residence and from 0.5 to 0.75 if a parcel is improved with a multiple-story residence; and 2. Ordinance (TC09-014) to make the following revisions to Title 17 of the Tuolumne County Ordinance Code: A. Increase the maximum Floor Area Ration (FAR) for substandard parcels in the R-1 (Single-Family Residential), R-2 (Medium Density Residential) and R-3 (Multiple-Family Residential) zoning districts from 0.5 to 0.6 if a parcel is improved with a single-story residence and from 0.5 to 0.75 if a parcel is improved with a multiple-story residence; and B. Increase the maximum size of a permitted secondary single-family dwelling from 850sf to 1,200sf in the R-1, RE-1 (Residential Estate, One-Acre Minimum), RE-2 (Residential Estate, Two-Acre Minimum), RE-3 (Residential Estate, Three-Acre Minimum) and RE-5 (Residential Estate, Five-Acre Minimum) zoning districts.

Contact Information
Mike Laird
Tuolumne County
2 South Green Street
Sonora, CA 95370

(209) 533-5633
(209) 533-5616

Location

Counties
Tuolumne

Notice of Determination

Approving Agency
Tuolumne County
Approving Agency Role
Lead Agency
Approved On
Final EIR Available Location
Community Development Department A.N. Francisco Building, 4th Floor 48 Wesy Yaney Ave Sonora, CA

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A Statement of Overriding Considerations was adopted for this project
No
(5) Findings were made pursuant to the provisions of CEQA
No
Download CSV New Search