River Ranch Estates Residential Development
4 Documents in Project
Summary
SCH Number
1996072055
Lead Agency
Madera County
Document Title
River Ranch Estates Residential Development
Document Type
NOD - Notice of Determination
Received
Posted
5/17/2004
Present Land Use
The project site is currently zoned for Agricultural Rural Foothill, Rio mesa Area Plan as Low Density Residential Very low Density Residential.
Document Description
The project consists of a tentative subdivision map which would divide approximately 793 acres into 181 lots and 40 outlots in the first phase. The ultimate development of the subdivision, which will occur through future subdivision map filings, will result in approximately 1,646 lots. A rezoning is included to establish zoning designations for this subdivision which are consistent with the proposed land use plan. The project also includes a master infrastructure plan and design standards for the 1,722 acre North Fork Village Sub-area, of which the proposed subdivision is a part.
Contact Information
Name
David Merchen
Agency Name
Madera County Planning Department
Contact Types
Lead/Public Agency
Phone
Location
Counties
Madera
Cross Streets
Road 206/Road 145
Parcel #
51-720-01, -03-11, 51-220-06-07, 51-200-28-30, 51-720-08, -10-11, 51-220-06-07, 51-200-28-30
State Highways
Hwy 41
Waterways
San Joaquin River
Township
11S
Range
20,21E
Section
12,13,
Other Location Info
Unincorporated Territory
Other Information
Section: 14, 23 and 24, 7 and 18
Notice of Determination
Approving Agency
Madera County Board of Supervisors
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.