Operation of Riverstone Village A Water System
6 Documents in Project
Summary
SCH Number
1996062020
Lead Agency
Madera County
Document Title
Operation of Riverstone Village A Water System
Document Type
NOD - Notice of Determination
Received
Posted
1/31/2018
Present Land Use
The project site is zoned for agricultural land uses. The current use of the property is agricultural land.
Document Description
SWRCB, as the responsible agency, will be issuing a water supply permit. The Riverstone Root Creek Water District will construct 1 tank (provisions for future second tank) and 3 wells to supply water to an estimated 858 homes, roadway frontage and park landscape, and agricultural turnouts to a new Riverstone Development. Well number 1 will have 250 HP and produce 1,300 gallons per minute, well number 2 will have 400 HP and produce 1,600 gpm, and well number 4 will have 300 HP and produce 1,400 gpm. A small 6-foot by 9-foot by 8-foot structure will house the sodium hypochlorite pump and plastic drums at the 3 wells sites and an injection quill will chlorinate the water before the water enters the hydropneumatic tanks at each site. A compressor will be attached to the tanks and space will be left for the addition of future wellhead treatment at these sites, as needed. Well 1 and Well 2 will connect to the 18-inch distribution line through 10-inch piping and then will connect to the one 1,000,000 gallon tank 3 600-gpm pumps (provisions for future 4th 600-gpm pump) will be installed to pump the water through 16 inch piping to an installed 7,500 gallon hydroneumatic tank. !2-foot pole mounted LED lighting wil lbeinstalled across the site. A 6-foot chain link fence will surround the site with barbed wire above it. A flow meter and SCADA system will be installed. From the hydropneumatic tank the water will be pumped through 16-inch piping to the already installed water system piping mains consisting of 12-inch, 14-inch, and 18-inch piping. Well 4 will connect to the water infrastructure with 12-inch piping. The project will provide for the operation of these systems.
Contact Information
Name
Kassy Chauhan
Agency Name
SWRCB
Contact Types
Lead/Public Agency
Phone
Location
Cities
Madera
Counties
Madera
Cross Streets
Highway 41 and Avenue 12
Zip
93638
Total Acres
2,392
Parcel #
049-076-005, 049-075-003, et al
State Highways
41
Waterways
San Joaquin River, Madera Canal
Township
11&12
Range
19&20
Section
32, 6,
Base
MBDM
Other Information
Section: 5, 7, et al
Notice of Determination
Approving Agency
SWRCB
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes