EXPANSION OF JAMES A. MUSICK FACILITY; INTERIM CARE FACILITY
7 Documents in Project
Summary
SCH Number
1996061024
Lead Agency
Orange County
Document Title
EXPANSION OF JAMES A. MUSICK FACILITY; INTERIM CARE FACILITY
Document Type
NOD - Notice of Determination
Received
Posted
12/11/2012
Present Land Use
Public Facility/General Agriculture (A1)/Public Facilities (4)
Document Description
The proposed project consists of revisions to the already approved expansion and operation of the James A Musick Jail. The previously approved project (approved in 1996) includes an increase to a maximum of 7,584 inmates from the current population of approximately 1,250. The population of the 7,584 inmates represents a "worst case" scenario. Like, the original project, the proposed expansion is anticipated to be phased over time with a variety of inmate population levels occurring over the project buildout, but with a different design and first phase. Related support structures will also be constructed.
Contact Information
Name
Tom C. Davis
Agency Name
Orange County Public Works
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Cities
Irvine
Counties
Orange
Cross Streets
Alton Parkway & Irvine Blvd.
Zip
92618
Total Acres
94
State Highways
I-5,SR 241
Waterways
Borrego Wash
Section
0
Other Location Info
Lake Forest
Notice of Determination
Approving Agency
City of Orange
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.