Pacific Commons Project

14 Documents in Project

Summary

SCH Number
1996052016
Lead Agency
City of Fremont
Document Title
Pacific Commons Project
Document Type
NOD - Notice of Determination
Received
Posted
4/25/2001
Present Land Use
Vacant/General Plan: Industrial, Commercial/Industrial overlay/Open Space, Planned District Zoning.
Document Description
The project site, Flood Control Channel N-1 is located adjacent to the Pacific Commons development in Fremont, Alameda County Assessor Parcel Number 531-0185-005-04. The operator proposes to install a 48-inch diameter stormdrain outfall pipe next to an existing 60-inch diameter outfall. The new outfall will carry storm water run off from Phase I for the proposed industrial park. Pre-construction surveys for burrowing owls will be done within 7 days of construction. If there is water in the worksite at the time of construction, a water diversion device will be implemented. The California Department of Fish and Game is executing a Lake and Streambed Alteration Agreement Number R3-2000-1093 pursuant to Section 1603 of the Fish and Game Code to the project operator, John Bertenshaw/Catellus Development.

Contact Information

Name
Derek Acomb
Agency Name
Department of Fish and Game /Central Region Coast
Contact Types
Lead/Public Agency

Location

Cities
Fremont
Counties
Alameda
Cross Streets
I-880 and Auto Mall Parkway
Total Acres
768+
Parcel #
Various
State Highways
I-880
Railways
Union Pacific
Waterways
San Francisco Bay

Notice of Determination

Approving Agency
Califronia Department of Fish and Game
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.