Pajaro Valley High School Athletic Field Project
12 Documents in Project
Summary
SCH Number
1996032052
Lead Agency
Pajaro Valley Unified School District
Document Title
Pajaro Valley High School Athletic Field Project
Document Type
NOD - Notice of Determination
Received
Posted
12/11/2017
Present Land Use
GPD: Pulbic/quasi-public; Z: CS-Z Coastal zone C
Document Description
The project would update existing athletic facilities by replacing existing grass turf with synthetic turf and adding a regulation track. The athletic fields would consist of two softball fields and a football field. The area is currently used as athletic fields. Bleachers would be added on the north side of the new field into a low hill that separates the lower-level practice field area from the higher central campus area. The bleachers would rise approx. 15 feet from grade elevation. The project would require the relocation of portable classrooms that are currently located in the proposed bleacher location.
Contact Information
Name
Victor Sandoval
Agency Name
Pajaro Valley Unified School District
Contact Types
Lead/Public Agency
Phone
Location
Cities
Watsonville
Counties
Santa Cruz
Cross Streets
Harkins Slough Road and PVHS Driveway
Zip
95076
Total Acres
7
Parcel #
018-281-63
State Highways
SR 1
Airports
Watsonville
Schools
Pajaro Valley HS
Waterways
Watsonville Slough
Notice of Determination
Approving Agency
Pajaro Valley Unified School District
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.