Southgate Water Quality Basin (Lake or Streambed Alteration Agreement No. 1600-2017-0073-R2)

12 Documents in Project

Summary

SCH Number
1996022060
Lead Agency
Sacramento County
Document Title
Southgate Water Quality Basin (Lake or Streambed Alteration Agreement No. 1600-2017-0073-R2)
Document Type
NOD - Notice of Determination
Received
Posted
8/28/2017
Present Land Use
Various
Document Description
CDFW has executed Lake and Streambed Alteration Agreement No. 1600-2017-0073-R2), pursuant to section 1602 of the Fish and Game Code to the project Applicant, County of Sacramento. Project is limited to the installation of a diversion weir and outfall structure as part of the Southgate Water Quality Basin. The diversion weir will be constructed to direct subdivision runoff through a water quality basin prior to entering Laguna Creek. The weir elevation has been designed to allow for runoff during large storm events to bypass the basin and flow directly into Laguna Creek. The outlet structure will be constructed to allow water to flow from the basin into the creek. Improvements to the creek will include the installation of a concrete headwall and wing walls, a 24-inch diameter pipe outlet with a flap gate, and rip rap surrounding the new concrete structure.

Contact Information

Name
Tanya Sheya
Agency Name
CDFW
Contact Types
Lead/Public Agency

Location

Cities
Vineyard (subdivision)
Counties
Sacramento
Cross Streets
Vineyard Road / Calvine Road
Zip
95829
Parcel #
Various
State Highways
SR 16
Railways
Central CA
Schools
Arnold Adreani ES
Waterways
Laguna Creek
Township
7N
Range
6E
Section
9,10
Base
MDBM
Other Location Info
Vineyard

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print