Butterfield Stage Road and Sewer Line Project

3 Documents in Project

Summary

SCH Number
1995112065
Lead Agency
Riverside County
Document Title
Butterfield Stage Road and Sewer Line Project
Document Type
NOD - Notice of Determination
Received
Posted
10/4/2012
Document Description
CDFG is executing a Streambed Alteration Agreement (SAA # 1600-2011-0279-R6) pursuant to Section 1602 of the Fish and Game Code to the project Applicant: Lennar Homes of California represented by Mr. Jeffery T. Clements, 391 N. Main Street, Ste 300, Corona, CA 92880. The Project is limited to the construction of an approximately 3,200-foot segment of Butterfield Stage Road including a bridge crossing Tucalota Creek and the construction of a sewer line across Tucalota Creek approximately 600 feet downstream of the bridge. The existing Arizona crossing of Puorroy Road over Tucalota Creek will be removed and the streambed will be restored to natural conditions. The construction of the new bridge will require the placement of falsework of the Creek. The sewer line will be constructed by trenching Tucaloca Creek, laying the sewer line, encasing the sewer line with concrete, placing rip-rap around the pipe, and then placing fill over the pipe to return the soil surface elevation to pre-project elevations. All the disturbed area will be revegetated and restored to previous conditions.

Contact Information

Name
Juan Lopez Torres
Agency Name
California Department of Fish and Game
Contact Types
Lead/Public Agency

Location

Cities
Temecula
Counties
Riverside
Cross Streets
MURRIETA HOT SPRINGS/POURROY RD
Parcel #
958-140-004
State Highways
79
Waterways
TUCALOTA CREEK
Township
7S
Range
2W
Section
8
Base
SBB&M

Notice of Determination

Approving Agency
CDFG
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.