2545 North Watney Way 058962-01 Project

3 Documents in Project

Summary

SCH Number
1995103069
Lead Agency
Public Utilities Commission, California (California Public Utilities Commission)
Document Title
2545 North Watney Way 058962-01 Project
Document Type
NOD - Notice of Determination
Received
Posted
5/27/2011

Document Description
The four project sites (C-1, C-2, C-3 and C-4) are located on Ledgewood Creek and a drainage canal within the City of Fairfield, Solano County. The project includes installation of a two-inch high density polyethylene conduit by the horizontal directional drilling method. No equipment will be operated within a minimum 150 feet of a stream. Small-diameter bore pits will be located within existing public easement right-of-ways. A Frac-out Plan and Procedures has been prepared. The California Department of Fish and game is executing a Lake and Streambed Alteration Agreement Number 1600-2011-0095-3 pursuant to Section 1602 of the Fish and Game Code to the project Applicant, Carl D. Hirchenhofer/MCImetro Access Transmission Services LLC.

Contact Information
Brenda Blinn
California Department of Fish and Game
Bay Delta Region 7329 Silverado Trail
Napa, CA 94558

Phone : (707) 944-5541

Location

Cities
VARIOUS

Notice of Determination

Approving Agency
California Department of Fish and Game
Approving Agency Role
Responsible Agency
Approved On
Final Environmental Document Available at
California Public Utilities Commission 505 Van Ness Avenue San Francisco, CA 94102-3298

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
N/A
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.